Skip to content

Consortium

Consortium

Since December 2025 enbility is carried by six parties jointly. Each of them builds or tests products that depend on EEBUS working properly — that is the whole governance model.

SPiNECompany

Software and hardware for smart metering systems and energy assets in the German market — including the EnergyLink One gateway, which speaks EEBUS to heat pumps, PV, storage and wallboxes on site.

Read more
Coretech InnovationsCompany

Embedded Linux, IoT and EEBUS tooling from Munich and Cairo: EEBUS Hub for SiL/HiL device testing, Verify 360 for qualification readiness, and gateway stacks for D-Bus, REST and MQTT.

Read more
EnQSCompany

Energy management and IoT engineering out of Karlsruhe, spun off from FZI in 2016. Runs a test lab with real PV, batteries, wallboxes and test SMGWs that customers reach over VPN.

Read more
Kontron eSystemsCompany
Kontron eSystems GmbH, based in Wendlingen, develops and produces technologically leading AC charging solutions for intelligent and connected charging of electric cars. Core products are mobile and permanently installed AC charging systems, as well as modular system solutions for connection to smart homes and integration into the smart grid. The technologies of eSystems enable grid and user-friendly charging. eSystems is a certified automotive supplier. Our deep connectivity and cybersecurity expertise ensures secure, connected products. As a certified automotive supplier and experienced industrial partner, Kontron eSystems guarantees the highest quality standards and complete, efficient system integration from a single source. With approximately 7,000 employees worldwide, Kontron represents industrial strength and innovation leadership.Show more +
Read more
Individuals2 people

Andreas Linde and Kai Takac are members in a personal capacity rather than through a company.

Read more

Governance

How the project is governed

Roles, policies and decision rules are written down and agreed by all members — not left to whoever happens to hold the commit bit.

Steering committee

One representative per member. Decides on admissions, the strategic roadmap and anything the maintainers cannot settle among themselves.

Lazy consensus by default

Day-to-day work runs on informal agreement. Only defined decisions — licence, policy or domain changes among them — require a formal vote.

A committed minimum

Each member contributes at least 32 hours a month, in code, infrastructure, documentation or community work. Contributions are reviewed quarterly.

Read the full governance document

Beyond code

Products and services offered by consortium members

The libraries are free, and nobody sells them. What the consortium members do sell are the products and services around them — certified hardware, test capacity and implementation work.

The EnergyLink One gateway for DIN rail mounting, with LAN ports and status LEDs
SPiNE

EnergyLink One

The first box officailly qualified with the enbility EEBUS stack: limitation of power consumption and production in both roles — as the controllable system (CS/HEMS) and as the energy guard (EG, the German Steuerbox) — plus power and grid connection point monitoring and SHIP pairing. It runs alongside a local HEMS such as evcc, connects to a cloud HEMS, or is extended with your own applications and connectors through the SDK.

  • LPC
  • LPP
  • MPC
  • MGCP
  • SHIP pairing
  • CS and EG roles
  • HEMS and cloud HEMS
  • SDK for own applications
The EEBUS Hub interface showing connected devices, in front of a charging car
Coretech Innovations

EEBUS Hub and qualification

A simulation and test framework for EEBUS device development, a validation suite that reports what still stands between a device and certification readiness, and use case implementation for customers who need the protocol inside their own product.

  • EEBUS Hub
  • Qualification readiness
  • Use case implementation
An engineer wiring test hardware in the EnQS lab
EnQS

EEBUS test lab

A lab wired with real PV systems, battery storage, wallboxes and test smart meter gateways, reachable over VPN — where an EEBUS implementation or integration meets hardware that behaves like hardware, not like a simulator.

  • Implementation testing
  • Integration testing
  • Remote access
The ghost ONE wallbox charging a car, winner of the iF Design Award 2024
Kontron eSystems

Hardware built on eebus-go

Wallboxes, charging cables, inverters and storage that speak EEBUS through the same stack — and the option to have the electronics developed and manufactured for the job, from prototype to series production.

  • Charging hardware
  • PV and storage
  • Custom EMS electronics